DIMS-AF-100 A-Frame LARS
A hydraulically luffed stern A-Frame with an integrated Launch and Recovery Stabilization System. Two box legs on combined pivot and cylinder-pedestal foundations carry a crossbeam with a LARS docking frame. In Mode 1 a trencher is lifted on the vessel's lift wire; in Mode 2 a jetting ROV is lifted on its lift-and-control umbilical. In both modes the LARS frame docks, stabilises and restrains the vehicle while the lifting medium carries the load. Download the DIMS-AF-100 datasheet (PDF).
- Docking cone with compliant snubber ring, 1.85 m head travel, in-plane rotation and swing damping
- Two Ø650 / Ø300 luffing cylinders, 350 bar, counterbalance valves: parked to splash zone in ≤ 150 s
- Open Siemens PLC and HMI, supplied with full source code and no password restrictions
- Interface load report, local deck analysis and foundation drawings included; new-build or retrofit
Full specification
| Safe working load | 100 Te in all operating positions, up to Sea State 5 |
|---|---|
| Design load basis | SWL × DAF 2.0 (200 t at docking-cone axis) |
| Operating modes | Mode 1: trenchers on lift wire · Mode 2: jetting ROVs on lift-and-control umbilical |
| Reach from pivot | 7.2 m inboard / 12.1 m outboard |
| Clear width between legs | 11.0 m |
| Operating envelope | 35° parked (inboard) to 155° splash zone; ≤ 150 s outboarding |
| Luffing system | 2 × Ø650 / Ø300 cylinders, ≈ 6.5 m stroke, 350 bar |
| LARS docking-head travel | 1.6 m standard; 1.85 m incl. control stroke |
| Sheaves | Leg-top and crossbeam lift-wire sheaves, SWL 100 Te; fixed LARS sheave; 12 Te umbilical sheave |
| Power supply | Containerised HPU ≈ 480 kW (3 × 160 kW), 440 V / 60 Hz, water-cooled |
| Control system | Siemens PLC and HMI, manual / automatic modes, open source code |
| Position monitoring | A-Frame in/out sensors; cylinder-integrated transducers on docking head |
| Overall envelope (W × H) | ~ 14.2 × 16.9 m above main deck (parked) |
| Estimated dry weight | ≈ 140 t assembly (TBC) |
| Design code | ABS Guide for Certification of Lifting Appliances 2024; CRC (OC-Subsea) considered |
| Testing | ABS-witnessed FAT and load test |
| Document no. | 541.01-ASG-SCH-002-A |