Named in honour of James Clerk Maxwell, whose pioneering work on electromagnetism underpins modern power and communications, the Maxwell Class brings multiple offshore capabilities together in one versatile vessel — long-distance fibre-optic cable laying and repair, inter-array power cable installation, and deep ploughing and trenching support, with walk-to-work readiness and accommodation for up to 100 personnel on extended offshore campaigns.
Designed for long-distance fibre-optic cable laying and repair, power cable installation, and deep ploughing and trenching support, the Maxwell Class also offers walk-to-work readiness and accommodation support for offshore wind farm installation campaigns. One hull, one mobilisation, and a mission spread that changes with the contract rather than the vessel.
Design renders of the Maxwell Class in its fibre-optic and power cable configurations — carousel and tank arrangement below deck, cable handling and plough spread aft, and the deck layout that carries both.
Long-distance fibre-optic lay and repair — 5,250 t of combined fibre-optic capacity worked through twin 40 t SMD cable drum engines.
Inter-array cables and electrification — inter-array power cable installation and offshore electrification projects on the 2,250 t dual-mode carousel.
Deep ploughing and trenching — SMD MD3-XT plough spread with burial depths up to 3.3 m, subject to seabed conditions.
Walk-to-work and accommodation support — offshore wind farm installation campaigns, with accommodation for up to 100 personnel.
| Vessel & Programme | |
| Type | Multipurpose hybrid cable lay vessel |
|---|---|
| Class name | Maxwell Class — after James Clerk Maxwell |
| Design status | Preliminary design · September 2026 |
| Mission spread | SMD partnership + Dimension cable system |
| Cable Capacity & Handling | |
| Combined FO cable capacity | 5,250 t |
| Carousel | 2,250 t dual-mode — power and fibre-optic cable |
| Power cable laying system | Dimension — class-leading, proven system |
| Cable drum engines | 2 × 40 t, SMD |
| Stowage form | Below-deck carousel plus cable tanks |
| Ploughing, Trenching & Subsea | |
| Plough | SMD MD3-XT |
| Burial depth | Up to 3.3 m, subject to seabed conditions |
| ROV hangars | Dual |
| Power, Propulsion & Station Keeping | |
| Propulsion | Diesel-electric — large and small generator sets |
| Energy storage | 1,500 kWh battery energy storage |
| Station keeping | DP2 design |
| Hull & ballast | Arranged for balanced trim and operational stability |
| Accommodation & Offshore Support | |
| Persons on board | Up to 100 |
| Walk-to-work | Ready — optional motion-compensated gangway |
| Campaign role | Offshore wind farm installation and accommodation support |
| Optional Upgrades | |
| Offshore crane | 150 t active heave-compensated (AHC) |
| ROV | 1,000 hp |
| Gangway | Motion-compensated |
Preliminary design. Particulars beyond those listed above are subject to final engineering — talk to our engineering team for the current design package.
Design overview — mission versatility, cable-handling spread, ploughing capability and the optional upgrade list for the Maxwell Class.
Preliminary design, September 2026. Particulars subject to final engineering. Renders for illustration.