SW Duke — Skipsteknisk ST-321 · Turnkey Conversion to Plough-Capable Cable Burial & Repair Vessel
A towing platform, converted by Dimension as a turnkey project through partner shipyards, with leading vendor support across the plough and cable-handling spread. 145 t continuous bollard pull — comfortably over the MD3-XT requirement — with bow, stern and azimuth thrusters already fitted and 20 kn transit speed for rapid-response work. Configured around ploughing rather than cable volume.
Teal-flagged items in the specification below denote new or modified equipment within the conversion scope.
It's ploughing, not post-lay burial, that decides the bollard pull requirement. With 145 t on the hook — and power in hand to support a high-power trencher — the ST-321 suits a plough-burial and repair role, or works alongside a lay vessel, rather than a high-volume carrying mission.
| Principal Particulars | |
| Design | Skipsteknisk ST-321 |
|---|---|
| Built | 2010 · Factorías Juliana, Spain |
| Length overall | 107 m |
| Beam, waterline / max | 19.2 / 22.0 m |
| Max draught | 6.5 m |
| Gross tonnage | 7,130 |
| Deadweight | To be confirmed |
| Water ballast | 1,230 m³ |
| Roll reduction | Passive anti-roll tank |
| Cable Capacity — Converted | |
| Cable tank, below deck | ≈1,250 t · Ø13 m |
| FOC per load-out | ≈1,700 – 2,100 route-km |
| Stowage form | Below-deck cable tank |
| Power & Propulsion | |
| Main engines | 2 × 4,500 + 2 × 3,000 kW MAN |
| Total installed power | 15,000 kW |
| Propulsion | 2 × 7,100 kW geared, twin CPP |
| Shaft generators | 4 × 2,200 ekW on PTO |
| Electrical capacity | 8,800 kW, shared with shafts |
| Bow / stern thruster | 1,200 / 925 kW |
| Retractable azimuth | 2,100 kW |
| Total thruster power | 4,225 kW |
| Performance, Accommodation & Class | |
| Max / transit speed | 20 / 17 kn |
| Range at transit | 11,000 nm |
| Endurance | 34 days at sea |
| Fuel / fresh water | 1,820 / 173 m³ |
| Continuous bollard pull | 145 t |
| Dynamic positioning | DP2 — retrofit |
| Persons on board | 60 |
| Cable Handling & Deck — All New | |
| Lay & burial ROV | SMD QT600 |
|---|---|
| Burial depth | 3.0 m · 2,500 msw · 450 kW |
| Drum cable engine | SMD, Ø4.0 m, 40 t |
| DOHB | 4 wheel-pair, 4 t |
| Stern sheaves | 2 × Ø3.0 m |
| Plough | SMD MD3-XT |
| Plough trench depth | 3.3 m · 23.5 t in air |
| Plough max tow load | 80 te |
| Plough LARS | A-frame 60 – 100 t SWL |
| Tow winch | 80 t · 3,500 m |
| Work-class ROV | 2,000 m rated, with LARS |
| Grapnel & A&R winch | 60 t |
Prepared September 2026. Subject to inspection and final equipment selection.
Talk to our engineering team about feasibility, acquisition structuring or the fibre-optic mission-spread scope.