Geo Celtic — Skipsteknisk ST-327 · Turnkey Conversion to a Carousel-Equipped Cable Vessel
A 24 m beam hull taking a 20.5 m carousel below deck, delivered by Dimension as a turnkey conversion through partner shipyards, with leading vendor support across the mission spread — ≈3,500 t of fibre-optic cable, or ≈2,500 t of power cable — with 15,480 kW of installed power and a guide price of USD 25 m. The complete fibre-optic mission spread is supplied new.
Deadweight shown is the sister-ship figure pending owner confirmation. Teal-flagged items in the specification below denote new or modified equipment within the conversion scope.
24.0 m gives a 20.5 m carousel below deck: ≈3,500 t of fibre-optic cable, or ≈2,500 t of power cable on the same machine — with spare tanks adding a further ≈600 t of fibre-optic capacity, for ≈4,000 t combined. Every item of the fibre-optic mission spread is new, with full 3.5 m ploughing capability to meet deep burial challenges.
| Principal Particulars | |
| Design | Skipsteknisk ST-327 |
|---|---|
| Built | 2007 · Bergen Group, Norway |
| Length overall | 101 m |
| Beam, hull / extreme | 24.0 / 28.0 m |
| Max draught | 7.5 m |
| Gross tonnage | 12,110 |
| Deadweight | ≈5,480 t |
| Fresh water production | 90 m³/day |
| Cable Capacity — Converted | |
| Carousel, below deck | ≈3,500 t FO · Ø20.5 m |
| Power cable capacity | ≈2,500 t |
| Spare tanks | +≈600 t FO — ≈4,000 t combined |
| FOC per load-out | ≈4,700 – 5,800 route-km |
| Stowage form | Below-deck carousel |
| Power & Propulsion | |
| Main generators | 4 × Rolls-Royce B32:40 @ 3,870 kW |
| Total installed power | ≈15,480 kW |
| Propulsion | 2 × 4,200 kW, low-noise CPP |
| Bow thruster | 1,200 kW fixed pitch |
| Retractable azimuth | 1,500 kW — new |
| Stern thruster | 1,200 kW — new |
| Energy storage | 1,500 kWh ESS — new |
| Electrical system | 690 / 440 / 220 V |
| Performance, Accommodation & Class | |
| Max / cruising speed | 15 / 13 kn |
| Endurance | 42 days at sea |
| Fuel / fresh water | 2,420 / 258 m³ |
| Continuous bollard pull | 125 t |
| Dynamic positioning | DP2 — retrofit |
| Persons on board | 69 single cabins |
| Classification | DNV · Ice(C) · DK(+) |
| Cable Handling & Deck — All New | |
| Carousel, below deck | Ø20.5 m · 3,500 t FO |
|---|---|
| Lay & burial ROV | SMD QT600 |
| Burial depth | 3.0 m · 2,500 msw · 450 kW |
| Drum cable engine | SMD, Ø4.0 m, 40 t |
| DOHB | 4 wheel-pair, 4 t |
| Stern sheaves | 2 × Ø3.5 m |
| Quadrant | 1 × 40 t SWL |
| Plough | SMD MD3-XT |
| Plough trench depth | Full 3.5 m · 80 te tow load — deep burial capability |
| Plough LARS | A-frame 60 – 100 t SWL |
| Work-class ROV | 2,000 m rated, with LARS |
Prepared September 2026. Subject to inspection and final equipment selection.
Talk to our engineering team about feasibility, acquisition structuring or the fibre-optic mission-spread scope.