SW Columbus — Ulstein SX124
Conversion Candidate · Cable Repair Conversion

SX124

SW Columbus — Ulstein SX124 X-BOW · Turnkey Conversion to Fibre-Optic Repair & Maintenance Vessel

Design Ulstein SX124 · X-BOW Built 2009 · Barreras, Spain

A 2009-built Ulstein SX124, converted to a dedicated fibre-optic cable repair ship as a turnkey project delivered by Dimension through partner shipyards, with leading vendor support across the cable-handling spread. Removing the existing mission equipment releases ≈900 t of lightweight and hands over spaces already shaped for cable work — ≈1,550 t of cable in a below-deck tank, with the complete fibre-optic mission spread supplied new.

89m
Length Overall
10,800kW
Installed Power
1,550t
Cable Capacity
40days
Endurance
69
Persons on Board
Vessel NameSW Columbus
IMO9452945
Keel Laid2007
ClassificationDNV ✠1A1 BWM(T) Clean COMF(V-3) E0 HELDK Ice(C) NAUT(AW) SF TMON

Teal-flagged items in the specification below denote new or modified equipment within the conversion scope.

Market Context

A Repair Ship the Market Is Short Of

Around 64% of the global cable maintenance fleet reaches end of service life by 2040 against a 48% growth in cable kilometres, and most of the replacement demand sits in Asia. A converted SX124 answers that demand at a fraction of newbuild cost and lead time.

  • A proven X-BOW hull, already built — second-hand acquisition and conversion well below newbuild cost, with delivery in months against multi-year newbuild lead times.
  • A complete handling & burial spread — 40 t drum cable engine, SMD QT600 burial ROV to 2,500 msw, twin Ø3.0 m stern sheaves, 30 t quadrant and 60 t A&R winch.
  • Turnkey delivery, backed by leading vendors — engineering, partner-shipyard execution and vendor-supplied cable tank, ROV and jointing spread as one scope of supply.
Technical Details

Principal Particulars

Principal Particulars
DesignUlstein SX124 · X-BOW
Built2009 · Barreras, Spain
Length overall89 m
Length b.p.82 m
Beam, moulded19.0 m
Depth8.0 m
Max draught6.6 m
Lightship≈3,760 t
Deadweight≈3,780 t
Cable Capacity — Converted
Cable tank, below deck≈1,650 t · Ø14 m
FOC per load-out≈2,050 – 2,550 route-km
Stowage formBelow-deck cable tank
Power & Propulsion
Main generators6 × Wärtsilä 9L20 @ 1,800 kW
Total installed power≈10,800 kW
Propulsion2 × 3,000 kW, twin CPP Ø3.6 m
Bow thruster1,200 kW tunnel
Retractable azimuth850 kW
Stern thruster1,200 kW — new
Energy storage1,500 kWh ESS — new
Emergency generator185 ekW
Performance, Accommodation & Class
Max / economy speed15.5 / 10.5 kn
Endurance40 days at sea
Fuel / fresh water1,510 / 770 m³
Continuous bollard pull88 t
Dynamic positioningDP2 — retrofit
Persons on board69
ClassificationDNV · Ice(C) · NAUT(AW)
All-New FO Cable Handling Spread

Burial ROV · DOHB · Stern Sheaves · Work-Class ROV

Cable Handling & Deck — All New
Lay & burial ROVSMD QT600
Burial depth3.0 m · 2,500 msw
Burial ROV power450 kW
Burial ROV LARSA-frame + umbilical winch
Drum cable engineSMD, Ø4.0 m, 40 t
DOHB4 wheel-pair, 4 t
Stern sheaves2 × Ø3.0 m
Firing line≈45 m to stern sheaves
Quadrant1 × 30 t SWL
Work-class ROV2,000 m rated, with LARS
Offshore crane10 t @ 20 m retained
Grapnel & A&R winch60 t
Conversion Candidates

Other Hulls Under Review

Prepared September 2026. Subject to inspection and final equipment selection.

Conversion enquiries

Interested in the SX124 conversion?

Talk to our engineering team about feasibility, acquisition structuring or the fibre-optic mission-spread scope.