Case Studies

Selected delivery records from Dimension's cable-lay, vessel-conversion, T&I, shore-pull-in, trenching and offshore equipment portfolio.

Selected Projects

Engineering, Executed at Sea

GL2030
Vessel Conversion · LSMS · 2025–26

GL2030

Vessel Extension, Conversion & Cable Lay Equipment Package

Vessel Conversion LSMS
7,000MT
Carousel Capacity
19m
Mid-Section Extension
111.5m
Overall Length (post-conv)
View case study
TPC II — OSS topside lift
T&I · Submarine Cable · Offshore Wind · 2025

TPC II

End-to-End T&I Delivery — Concept to Ready-to-Install in 8 Months

T&I Submarine Cable Offshore Wind
8mo
Concept to Install
13
T&I Workstreams
8,700MT
Cable Mass
View case study
TPC II Shore Pull-In
Shore Pull · Landfall · TPC II · 2025

TPC II Shore Pull-In

Changhua Phase 2 — 300 MW Offshore Wind Farm Export Cable Landfall

Shore Pull Landfall TPC II
3
Export Cables
850m
Cable Float-out
700m
HDD Pull-in
View case study
JN1 Offshore Wind — CPS Quadrant in operation
Offshore Wind · Cable Lay · Trenching · 2024

JN1 Offshore Wind

99 MW Wind Farm — Korea's first fully CPS Q&A-frame, 10 m VI & retractable thrusters in 9 months for LSMS

Offshore Wind Cable Lay Trenching
9mo
Concept to Offshore
10m
VI Burial Depth
99MW
Wind-Farm Output
View case study
Singapore – Malaysia Interconnector
Cable Lay · Power Interconnect · Project Recovery

Singapore – Malaysia Interconnector

Woodlands · 230 kV Power + Auxiliary · Mid-Project Takeover for SP Group & LS Cable

Cable Lay Power Interconnect Project Recovery
3mo
Mid-Project Recovery
230kV
Power Cable Voltage
8 + 6
Power + Aux Cables
View case study
Orient Adventurer spooling arm in service
Cable-Lay Equipment · Vessel Conversion · 2025

Orient Adventurer

Spooling Arm & Hatch Package · Dong Fang Offshore — Concept-to-Delivery in 7 Months

Cable-Lay Equipment Vessel Conversion
7mo
Concept to Delivery
18.75m
Spooling-Arm Reach
270°
Radial Arm Rotation
View case study
Supreme Energy II — FLMP barge
Vessel Conversion · Drilling Support · 2013

Supreme Energy II

Floating Mud Plant Barge Conversion

Vessel Conversion Drilling Support
24
Mud Tanks (490 bbls each)
12
Brine Tanks
0.5day
Mud Cycle (vs 3-day baseline)
View case study
Track Record

Delivered, Across Continents

600+
Installations
99+
Countries
15+
Years
0
Lost-time incidents